
Summary
- For 2027 planning, budget about $7,500–$17,000 installed for a Bath Fitter tub or shower update. The range comes from our franchise’s own 2026 pricing.
- Bathtub update: $7,500–$16,500. Shower remodel: $8,000–$17,000. Tub-to-shower conversion: $8,500–$17,000.
- Our installation team estimates that about 9 in 10 jobs scheduled for one day finish that day. A repair that needs time to dry can mean a return visit.
In this guide
Have you ever seen an ad for a one-day bathroom remodel and thought, “Okay, what’s it going to cost me?” And when they say “one day,” are you showering that night or borrowing somebody else’s shower?
We get it. You want a number, and you want to know when you can shower again. Homeowners ask our local teams those two questions all the time. We’ll show you what our tub and shower updates cost, what can get done in a day, and when a bigger remodel may make more sense.
How much does a one-day bathroom remodel cost in 2027?
For 2027 planning, budget $7,500 to $17,000 installed for a Bath Fitter tub or shower update. That range covers the bathing area. If you also want to replace the vanity, flooring or lighting, ask for a whole-room quote. Start with what you’re changing:
| What are you changing? | Installed price range | What you’re getting |
|---|---|---|
| Keeping a bathtub | $7,500–$16,500 | A bathtub update. Depending on the condition of the existing tub, discuss a fitted liner or a replacement. |
| Replacing an existing shower | $8,000–$17,000 | A shower base and custom-fit acrylic walls, with your choice of compatible fixtures and accessories. |
| Turning a tub into a shower | $8,500–$17,000 | Old tub removal and haul-away, a new shower, a new valve and repairs to water damage within the tub or shower area. |
These 2027 planning ranges come from our franchise’s own 2026 installation pricing. Your written quote depends on the room and what you choose. If you’re taking out a tub, our 2027 tub-to-shower conversion cost guide compares what you can get with a ready-made kit, custom acrylic or tile.
Want a range for your own bathroom? Pick your project and the features you want.

What does a Bath Fitter one-day installation include?
When we schedule a one-day install, that’s the day we plan to spend working in your bathroom. A lot happens before our van pulls into your driveway. We’ve measured your bathroom, walked through your choices with you and gotten your materials ready. The price you see here covers the tub or shower area. The vanity, toilet, lighting and flooring in the rest of the room are separate projects.
Our installation team estimates that about 9 in 10 jobs we schedule for one day finish that day. Some jobs are planned for longer from the start. When a job we planned for one day runs over, it’s often because we find something that needs attention once the old tub or shower comes out. We give the repair the time it needs before the new bath or shower goes in. Read more about how our team plans one-day installs.
Here’s what that looks like for a Bath Fitter tub-to-shower conversion:
- We protect the work area and haul away the old tub. Once it’s out, we check the floor, walls and plumbing behind it.
- We put in the new shower and a new valve. Your quote includes the custom-fit base and acrylic walls, along with the fixtures and options you picked, such as a seat, grab bars or glass.
- We clean up and walk you through the finished shower. Before we leave, we’ll tell you when you can turn the water on and how to care for the new surfaces.
If you’re keeping a bathtub or replacing an existing shower, we’ll spell out what stays, what comes out and what’s included in your written quote. Bath Fitter makes the acrylic to fit your bathroom. Our local employees measure, install and handle service afterward. If you need us after install day, you already know who to call. The one-piece wall wraps around the corners without grout lines to scrub. We don’t offer tile installation. If you like the look of tile, ask to see our tile-pattern acrylic samples. Compare acrylic shower walls with tile.
Want to see how that looks in a real bathroom? See the before-and-after photos from a tub-to-shower conversion in Yukon, Oklahoma.
Can you use the shower while you wait for custom glass?
Yes, once your installer says the shower is ready for water. Some custom doors are measured after the new shower is in, then fitted on a second visit. We offer a temporary curtain so you can use the shower while your glass is being made. If your shower is ready for water on installation day, you can use it that day with the curtain. If the sealant needs more time, your installer will tell you when it’s safe to shower. See what happens from consultation to installation.
What happens if we find damage behind your tub or shower?
Once we remove the old tub or shower, we check the exposed walls, floor and plumbing before installing the new tub or shower. If we find rot or water damage in the tub or shower area, the repair is included in our conversion price. Some repairs can be done on the spot and the job can still finish that day.
If the exposed area needs time to dry, we’ll wait before putting in the new base and walls and explain when we can come back to finish. If we find a bigger structural problem, like a damaged floor joist that needs a specialist, we’ll show you what we found, explain what needs to happen and talk through when we can come back to finish.
Moving a drain or valve can also add time. We’ll talk through whether moving it makes sense for your bathroom and what it would take. If a job needs more time, we’d rather take it and do the work right.
What do homeowners say about installation day?
Google review
Walter did a great job installing the tub. Explained the process of what he needed to do and cleaned up everything and left it neater than he found it. He was all done by noon!
Mike Evans
Oklahoma City · November 2025
Bathtub remodeling
Google review
My Bath Fitter installation went smoothly and without any hassle! Barry, our installer, was a pleasure to work with and very flexible. The installation included a complete demolition and reinstall of our plumbing, floor drain and shower. Barry was respectful of our space, opinions and fun to work with. We would welcome Barry back anytime for service of future work!
RuthS
Tri-Cities · November 2025
Shower remodeling
Browse more Bath Fitter reviews.
How do you compare two one-day remodel quotes?
Put both quotes on the kitchen table. Before you look at the big number at the bottom, ask who’s hauling out the old tub and what happens if there’s rot underneath it. Then check the valve, walls and door or curtain. Our conversion price includes haul-away, a new valve and repairs to rot or water damage in the tub or shower area. A lower quote can make sense if you’re happy with a simpler design. If you need seating, grab bars or a specific entry height, price those first and see what you have left for finishes.
Get three dates or time estimates in writing: when they can start, when they expect to finish and when the new bath or shower can be used. If you’re comparing companies, our guide to spotting shortcuts in a one-day remodel has more questions to take to the appointment.
What should you plan for if this is your only shower?
Ask the installer which parts of the bathroom you can use during the work. In a small room, the crew may need the whole space to carry out the old tub and bring in the new base. Clear the shower, the bathroom floor and the path to the door the night before. If you have kids, pets or someone who needs help bathing, make a backup plan for that evening until you know when the shower can get wet.
What would your bathroom cost?
If the rest of your bathroom works for you, start by pricing the part you want to change. Pick a tub update, shower remodel or tub-to-shower conversion and the features you’d use every day. You’ll get a free online price range before you decide whether to book a visit.
Last updated
Sources
Frequently asked questions
How much should I budget for a one-day bathroom remodel in 2027?
For a Bath Fitter Fam tub or shower project, plan on about $7,500 to $17,000 installed. That’s based on our franchise’s published 2026 pricing. The type of project and what you pick determine your written quote.
Can a tub-to-shower conversion really be done in one day?
Yes, many can be installed in as little as one day once the room is measured and the materials are ready. Our installation team estimates that about 9 in 10 jobs we schedule for one day finish that day. Some repairs can be done during the install, while others need time to dry before we can finish.
Does a one-day remodel include the whole bathroom?
Usually it covers the tub or shower area. Ask for a written scope if you also need a new vanity, toilet, lighting or flooring.
Can I shower the same night the installer finishes?
You can use it once your installer says it’s ready for water. If custom glass needs a second visit, we offer a temporary curtain so you can use the shower in the meantime. Your installer will tell you if the sealant needs more time.
Is a one-day remodel automatically cheaper?
The price depends on the work and materials. Compare what each quote includes for removal, plumbing, walls, fixtures and repairs before comparing the totals.
